| Fallen
Timber Production
Process Phase I : Locating fallen
trees in the forest |
|||
|
Click arrows to follow each step of the process (or simply page down) | ||
![]() First blocking (> 40cm diam.) |
![]() First quart blocking |
![]() Some blocks ready |
|
![]() Sharpening a chain |
![]() Facing a block with frame and saw |
||
|
Phase III:
Extraction of blocks with oxen (primary
trails) |
|||
![]() Bringing oxen to tree fall site |
![]() Dragging block with "pipante" (metal sled) |
||
|
|
||
![]() Transferring blocks to snall vehicle/dirt road |
![]() Unloading from oxen cart to concentration yard |
|
![]() Preparing blocks for milling |
||
Detail of fuel powered planer (exchangeable engines) |
Assembling small rocking chair |
| Back to Forest
Conservation Page
|